PERRY’S HEROES >> Information >> Work in progress

Carentan - Cafe de l’Octroi (part II)
Last News
  • 20/03/2025: [Horreur à Arkham JdR] Créatures de la nuits : les goules

  • 20/03/2025: [Horreur à Arkham JdR] Personnages

  • 13/03/2025: [Unfathomable] Player Characters (From the abyss)

  • 13/03/2025: [Unfathomable] Player Characters

  • 16/02/2025: CTHULHU - Horrors

  • 14/02/2025: CTHULHU - Deep ones

  • 14/02/2025: CTHULHU - Dagon & Hydra

  • 07/02/2025: ALIENS - Specialized Xenomorphs

  • Carentan - Cafe de l’Octroi (part II)

    25/01/2008
     

    part I

    Last night, I cut the sides from the foamcard, then the doors and the windows and finally I assembled the 4 sides.

    On some pictures, we can see that the side walls of the building were in raw stones in 1944.

    And it’s still the case nowadays.

    So I decided to cut and glue a textured plasticard on the side walls.

    I also noticed that on the front side of the building, the upper part looked covered with a protective rendering whilst the lower part (below the ground floor windows) was in raw stones too.

    Today the building is with raw stones walls. So I also added a small strip of textured plasticard on the lower part of the front and back walls.

    I’ll now have to work on the most difficult part, the windows.

    Part III