PERRY’S HEROES >> Information >> Work in progress

Carentan - Cafe de l’Octroi (part III)
Last News
  • 02/09/2019: US Infantry Platoon in Vietnam

  • 25/08/2019: US Infantry in Vietnam

  • 17/01/2018: South of Skalat : Tigers vs T34s

  • 19/04/2015: 21. Panzer Division infantry platoon

  • 28/01/2015: Total Battle Miniatures Low walls (Churchyard)

  • 11/01/2015: Total Battle Miniatures Church

  • 29/11/2014: Red Devils 6-Pdr Antitank Gun

  • 16/11/2014: Red Devils 1st Platoon

  • Carentan - Cafe de l’Octroi (part III)

    26/01/2008
     

    part II

    The next step was the windows. I used plasticard for the windows frames and the trim parts. I’ve got a bricks plasticard but it was a bit thin. So I first used 0.75mm thick plasticard.

    For the upper part of the frames, it’s a mix of stone and bricks. There are 12 windows and 2 doors so I decided to cut this parts into a 1.5mm plasticard.

    I also worked on the chimneys which are made with bricks and I added the upper part.

    Then I added the bricks plasticard on the trims and windows frames. I also built a dormer but unfortunately I ran out of tiles card so only one is finished.